top of page

Commercial
Experience

From multi-storey office developments, to new headquarters and a range of student and private accommodation – we work hard to turn our clients vision into reality

De Montfort University Campus

Leicester

Project Manager of the refurbishment over the 3 floors of this beautiful student campus centre. A more user-friendly environment has been created thanks to the large space in the centre of the building which links the ground and first floors with a running stair. The ground floor has been opened up to increase light and access. Glazing has been introduced at first floor level allowing connectivity with the newly landscaped Mill Lane

Langwith 

Medical Centre

Mansfield

Traditional brick/block build. This was completed in 25 weeks with a build programme of 28 and target of 26 weeks. I was praised by NHS for the quality of the build and the conduct the project was carried out.

The developer who funds the builds of medical centres uk wide, Commented on completion `This is the first time in a very long time we have had a medical centre handed over time let alone before time and to a very high quality finish.

Boulevard Wharf

Student Housing

Nottinghamshire

Number 2 project manager of this luxury student accommodation scheme.

The scheme is made of 3 curved buildings following the line of the canal. The Buildings were built on the canal edge, sheet piles held back the canal bank, then a ring beam was constructed on top of the sheet piles.
 

Royal Enfield 

Tech Centre

Nottinghamshire

Project Manager of this new state of the art two storey steel framed research, design and diagnostic facility is the innovation hub and global headquarters for Royal Enfield’s product strategy, product development, industrial design, research, programme management and analysis.

It features large areas of glazing and roof lights to maximise natural light coming into the building. Inside are cutting edge equipment and modern workshop facilities, with more than 3000m2 of workspace spread over two floors, housing a design studio, offices, engine, electrical and chassis build

73 Princess

Road East

Leicester

Project Manager of this 110 Bed luxury student accommodation
Piled foundations, the basement level was formed by sheet piles retaining the earth until, the in situ reinforced concrete retaining wall was cast to 3 elevations. The building is constructed of steel frame, SFS and a brick external skin

View our residential portfolio

Contact Us

bottom of page